000 | 00771nam a22001817a 4500 | ||
---|---|---|---|
005 | 20161110123953.0 | ||
008 | 160923b xxu||||| |||| 00| 0 eng d | ||
040 |
_aUPES LIBRARY _bEnglish |
||
082 |
_a622.3381 _bHEI |
||
110 |
_aHalliburton Energy Institute _931431 |
||
245 | _aModern completion practice | ||
260 |
_aUSA: _bHalliburton Company, _c1986 |
||
300 | _aV.p. | ||
500 | _aVol 1: drilling,drilling fluids, completion fluids, logging &perforating, casing design, cementing; Vol 2 : cementing, selecting tubing size hydraulic fracturing, chemical stimulation Vol 3 : sand control, drill stem testing, production testing, special tools, nitrogen, continuous tubing | ||
650 |
_aPetroleum engineering _933873 |
||
650 |
_aDrilling _933874 |
||
942 | _cBK | ||
999 |
_c28587 _d28587 |